Skip to content
BuildMetric Logo
BuildMetricF&K Estimatings

Search BuildMetric

Loading search…

Quantity Takeoffs • Cost Estimates • Bid Preparation

Construction Estimating Services
for US Contractors

Construction estimating and quantity takeoff support for US general contractors and trade subcontractors. Review civil sitework, earthwork, underground utilities and building trades with a defined drawing scope. Send your plans, specifications and bid deadline to request a project quote.

  • Itemized quantity schedules
  • Defined trade boundaries
  • Drawing-based scope
  • Project-specific quote

Civil Sitework & Construction Estimating Services

Choose the scope your bid needs, from site development to building trades.

Sitework Estimating

Civil clearing, grading, paving and exterior improvements, with utility interfaces defined.

  • Civil Scope
  • Paving Areas
  • Scope Boundaries
Explore Sitework Estimating →
Earthwork Estimating

Cut and fill quantities, surface assumptions and soil volume bases for grading packages.

  • Cut & Fill
  • Volume Basis
  • Import / Export
Explore Earthwork Estimating →
Excavation Estimating

Foundation pits and utility trenches with depths, working space and disposal assumptions.

  • Trench Quantities
  • Foundation Pits
  • Backfill Scope
Explore Excavation Estimating →
Underground Utility Estimating

Water, sanitary and storm drainage lengths, fittings, structures and trench interfaces.

  • Pipe Schedules
  • Structures
  • Restoration Scope
Explore Underground Utility Estimating →
Electrical Estimating

Conduit, wiring, fixtures and distribution equipment organized from electrical drawings.

  • Priced BOQ
  • Material Takeoff
  • Labor Hours
Explore Electrical Estimating →
HVAC Estimating

Ductwork, piping, equipment and insulation quantities by system and specification.

  • Ductwork & Piping
  • Equipment Counts
  • Labor Breakdown
Explore HVAC Estimating →
Concrete Estimating

Concrete volumes, reinforcement and formwork separated by structural element.

  • Concrete Volume
  • Rebar Tonnage
  • Formwork Area
Explore Concrete Estimating →
Drywall Estimating

Board, framing and ceiling quantities separated by wall and ceiling assembly.

  • Board Counts
  • Stud Quantification
  • Finishing Materials
Explore Drywall Estimating →
Roofing Estimating

Roof areas, flashing, insulation and penetrations with documented waste assumptions.

  • Area Calculations
  • Waste Factors
  • Labor Rates
Explore Roofing Estimating →
Steel Estimating

Structural members, decking and miscellaneous metal scope with fabrication boundaries.

  • Structural Steel
  • Miscellaneous Metals
  • Connection Details
Explore Steel Estimating →

Sample format · No client data

Civil Takeoff Sample Format

An illustrative quantity schedule showing drawing references, units and review notes. Example data explains the format; it is not a client result or priced estimate.

Illustrative civil takeoff quantities and drawing references
DrawingScope itemQuantityUnitBasis / review note
C-101Site clearing12,000SFLimits shown on civil plan
C-201Topsoil stripping111.11CY12,000 SF × 0.25 FT ÷ 27
C-301Storm drain pipe240LFSeparate pipe sizes and classes
C-301Drainage structures4EAReconcile plan and schedule

CSV opens in spreadsheet software. Actual drawing references, quantities, pricing and file formats depend on the agreed project scope.

A Clear Basis for Your Estimate

14
Trade service pages
Itemized
Quantity schedules
Drawings
Project inputs
Per quote
Scope agreement
Why Outsource to BuildMetric?

Why Outsource to BuildMetric?

Here's how BuildMetric solves your biggest estimating bottlenecks.

More scopes than your team can measure?

Use outsourced takeoff support for an agreed package while your team reviews vendor quotes, bid qualifications and final pricing.

Unclear quantities or overlapping trades?

Define drawing revisions, scope boundaries and exclusions before the takeoff starts. Separate quantities from pricing assumptions.

Working toward a bid deadline?

Share your deadline with the complete drawing set. The delivery schedule is agreed after the scope review.

Quantity Takeoff or Priced Estimate?

Feature Breakdown
Quantity Takeoff
Priced Estimate
Purpose
Measure the drawing scope
Build an agreed cost basis
Main inputs
Plans, details, schedules and addenda
Takeoff plus rates and productivity assumptions
Main output
Item descriptions, quantities and units
Agreed material, labor and equipment costs
Confirm before ordering
Scope limits and measurement conventions
Pricing date, exclusions and allowances

Estimating Process

Our 5-step estimating process

1

Upload Drawings

Provide drawings, specifications, addenda and your bid deadline.

2

Agree the Scope

Confirm the fee, deliverables, drawing revision and delivery schedule.

3

Quantity Takeoff

We extract precise material and labor quantities.

4

QA Review

Review quantities, assumptions and drawing references.

5

Delivery

Receive the agreed files and review scope qualifications before bidding.

Project Scope Inputs

Prepare Your Estimate Request

These inputs do not calculate costs, labor or a delivery date. Share the drawing set and bid deadline to confirm scope.

Selected Project Scope

commercial / electrical

Schedule

Confirm in your quote

Request a Scoped Quote

Project Scope Examples

Illustrative project packages showing the scope to discuss in your enquiry.

Healthcare Electrical Package
Illustrative scope
ScopeFixtures, panels, wiring and controls

Healthcare Electrical Package

Scope: Fixtures, panels, wiring and controls
Commercial Site Development
Illustrative scope
ScopeGrading, drainage and paving

Commercial Site Development

Scope: Grading, drainage and paving
Industrial Structural Package
Illustrative scope
ScopeMembers, decking and miscellaneous metals

Industrial Structural Package

Scope: Members, decking and miscellaneous metals

FAQ

What is included in a construction estimate?

The agreed scope may include drawing-based quantities and material, labor and equipment pricing. Your quote defines the trades, drawing revisions, file formats, assumptions and exclusions. A quantity-only takeoff does not include pricing unless it is requested.

What plans should I send for a quote?

Send current plans, specifications, schedules and addenda, the project location, the trades you need and your bid deadline. Flag incomplete documents and alternates. You can submit the enquiry first if the plan link is not ready.

How long does estimating take?

The delivery date is confirmed after reviewing the drawing set and requested scope. Tell us your deadline so availability, revision needs and any rush request can be considered.

Do you estimate civil sitework and building trades?

Review the sitework, earthwork, excavation and underground utility pages for civil packages. Electrical, HVAC, plumbing, concrete and other building trade scopes are also listed. Confirm your specific package in the quote.

How are quantities and pricing checked?

A useful review compares quantities with drawing references and schedules, identifies missing information and lists allowances. Pricing needs a documented date and project-specific supplier, wage and equipment inputs. Final bid review remains with the contractor.

Ready to Win More Projects?

Upload Your Plans Today